Sr. |
Issuing Authority
|
Tender
No. |
Item Details |
Last Date of Submission |
Download |
| 1 |
Executive Engineer Chandrapur |
No. EE/CH/O&M/Division/T/GPRS/ 12-13/ T-37 & T-38 |
for monthly meter reading by GPRS system for consumers under O&M Sub-Division I & IIChandrapur |
31-5-2013 |
|
| 2 |
Superintending Engineer,Nagpur Rural Circle,Nagpur |
SE/NRC/GFSS/13-14/ T-06 & T-07 |
Corrigendum 2 to SE/NRC/GFSS/13-14/ T-06 & T-07 |
28-5-2013 |
|
| 3 |
Executive Engineer(O&M), Panvel(U). |
EE/PNL-U/Tech/ MR / Tender-2 to 5 |
Corrigendum to tender no. EE/PNL-U/Tech/ MR / Tender-2 to 5 |
29-5-2013 |
|
| 4 |
S.E. Ganeshkhind ,Pune |
SE/GKUC/T-02/13-14 to SE/GKUC/T-08/13-14 |
Monthly meter reading data retrival data down loading of LT II/LT V consumers below 20KIW/27HP under Akurdi, Bhosari-I, Bhosari II Pradhikaran S.Dinv. of Bhosari Division & Pimpri , Kothrud & Shivajinagar divisions through CMRI respectively. |
27-5-2013 |
|
| 5 |
Chief Engineer (Infrastructure Plan) H.O. Mumbai. |
CE (Infra) /Infra-Part II /Phase-A / Mumbai / EE-IV/ 13-14/T-1 to T-21 |
supply, test, transport, construction, erection, testing and commissioning of sub-transmission lines, power transformers, new substations, augmentation of existing S/S, 11kV/22kV/33kV lines, distribution transformer centers of varying capacities Turnkey contractors for Infra Part-II Phase A in various Zones/ Circles. |
4-6-2013 |
|
| 6 |
Executive Engineer, Dombivali Division. |
EE/Domb./Tech/T-6 to T-9 |
Photo meter reading through Digital camera Data punching IR/RF meter reading through HHU of LT consumers (R&C) under Sub Division area of Dombivali Division. |
28-5-2013 |
|
| 7 |
Chief Engineer, (Infrastructure Plan) H.O.,Mumbai |
CE(Infra)/Infra-Part II/ Phase-A/Mumbai/EE-IV/13-14 T-1 to T-21 . |
Turnkey contractors for Infra Part II Phase - A under Pune, Bhandup , Kalyan, Baramati & Kolhapur zone. |
4-6-2013 |
|
| 8 |
Executive Engineer, Palghar Division |
EE/PLG/Tech/ 2013-14/T-25 |
Errection of HT/LT conductor & other allied works for Jayshet & other Pada electrification as per schedule rates for the year 2011-12 approved by S.E. Vasai on partial Turnkey basis under Palghar Sub-Division |
27-5-2013 |
|
| 9 |
Executive Engineer Palghar. |
Ee/PLG/Tech/2898 |
Corrigendum for T-02 to T-15. |
31-5-2013 |
|
| 10 |
Executive Engineer, Palghar |
EE/PLG/TECH/eTender-02 /2013-2014 to EE/PLG/TECH.eTender-16/2013-2014 |
eTender closing date extension notice. |
24-5-2013 |
|
| 11 |
Chief Engineer, Latur zone. |
CE/LZ/LTR/T5/T-01/2013-14 |
for repairing of failed Power Transformers of 3.00/3.15 and 5.00 MVA capacities under Latur Zone. |
29-5-2013 |
|
| 12 |
Executive Engineer, Palghar Division. |
EE/PLG/Tech/ 2013-14/T-17 to T-24 |
Errection of HT/LT line, transformer centre and its allied works as per schedule rates for the year 2011-12 approved by S.E. Vasai and schedule rates approved under DPR Infra on Full turnkey basis for wadi/pada electrification under various usbdivisions under Palghar Division. |
29-5-2013 |
|
| 13 |
Chief Engineer (MMC) |
SP/T-1001/0413 |
(On Two Bid System) Polycarbonate Meter Box suitable for LTAC Single Phase 5-30A static energy meter with IR port for communication.
OR
Meter Box made out of Sheet Moulding Compound(SMC) grade 1 suitable for LTAC Single Phase 5-30A static energy meter with IR port for communication. |
28-5-2013 |
|